Reference pages for the Malaysian e-invoicing rules we build against. Every date, band and threshold on them is read out of the LHDN e-Invoice Specific Guideline, and each page names the version it was checked against. Where a figure comes from someone else, the sentence that uses it says whose figure it is.
Section 17 of the e-Invoice Specific Guideline opens a disclosure window from 7 July 2026 to 31 December 2027 for submissions that were missed, malformed, or are already sitting under an IRBM compliance review.
Last verified 24 August 2026 against the LHDN e-Invoice Specific Guideline v4.8 (7 July 2026).
The whole phase-in, the exemption threshold, and the relaxation that runs to 31 December 2027 — reproduced from Table 16.1 of the guideline rather than from someone's summary of it.
Last verified 24 August 2026 against the LHDN e-Invoice Specific Guideline v4.8 (7 July 2026).
The free portal, an accounting-package module, per-document middleware, or a bridge built onto what you already run — with the figures attributed, and the cost driver nobody puts in a quote.
Last verified 24 August 2026 against the LHDN e-Invoice Specific Guideline v4.8 (7 July 2026).
Odoo, Kladana and the Malaysian cloud-ERP market on one side, a fixed-price build on the other, and the break-even worked out on published figures rather than asserted.
Last verified 24 August 2026 against Odoo's published pricing page, Kladana's published plan ladder, HashMicro's Malaysian ERP page, Supabase's and Vercel's published plan prices, and the Malaysian ERP cost ranges published by Keyway Digital Labs (29 April 2026) and SMURPS.
Four routes to a website, the ringgit ranges each one publishes, what genuinely moves the number, and the bill that arrives eighteen months after the cheapest build.
Last verified 24 August 2026 against the Malaysian web-build price bands published by Xwork (17 August 2026) and Walk Production (17 April 2026, updated 13 August 2026), Vercel's and Supabase's published plan prices, and our own published tiers.
Half your invoice up to RM 5,000, paid to your technology provider after you have paid your share, with the eligibility tests and the nine solution categories read off Bank Simpanan Nasional's own page.
Last verified 24 August 2026 against Bank Simpanan Nasional's own MSME Digital Grant MADANI page at bsn.com.my.
All four submit to MyInvois, and they are better at it than most people assume. The question worth asking is what happens to the invoices that were never raised inside them.
Last verified 24 August 2026 against the MyInvois SDK API documentation at sdk.myinvois.hasil.gov.my and the current e-Invoice pages published by AutoCount, SQL, Bukku and QNE.
What the rule lands on — a clinic day, a trip sheet, a machine-day — is set out sector by sector in the sector notes.